Drilling & Production Engineering

Method for Identifying the Cause of Blowout Stoppage of Horizontal Wells in Constant-Volume Gas Reservoirs and Its Application

  • Liu Shubing ,
  • Yan Xuecheng ,
  • Song Yang ,
  • Zhang Hexing ,
  • Liu Lei ,
  • Chen Hong
Expand
  • 1. PetroChina Changqing Oilfield Company, Xi'an, Shaanxi 710016, China;
    2. PetroChina Jilin Oilfield Company, Songyuan, Jilin 138000, China;
    3. PetroChina Daqing Oilfield Co., Ltd., Daqing, Heilongjiang 163001, China

Received date: 2023-05-16

  Revised date: 2023-09-01

  Online published: 2024-01-19

Abstract

The blowout stoppage of horizontal gas wells is a common problem in the middle and late stages of the development of constant-volume gas reservoirs, and it is necessary to identify the causes of the stoppage and take measures to restore production in a timely manner. To this end, the theoretical equation of critical liquid-carrying in horizontal wells was combined with the binomial deliverability equation of horizontal wells and the calculation equation of bottomhole flowing pressure to establish three criteria for blowout stoppage: critical liquid-carrying flow rate, critical lifting differential pressure, and critical formation pressure, analyze the influences of factors such as wellhead pressure and tubing inner diameter on the criteria, and study the roles of the three criteria in identifying the causes of blowout stoppage in gas wells, and then create a method to identify the causes of blowout stoppage of gas wells in a quick manner. The study shows that: The critical liquid-carrying flow rate has an increasing multiplicative power function with the wellhead pressure and tubing inner diameter, the higher the wellhead pressure and the larger the tubing inner diameter, the larger the critical liquid-carrying flow rate is, when the actual gas volume of the well is lower than the critical liquid-carrying flow rate, it can be determined that the wellbore has begun to accumulate fluids; the critical lifting differential pressure has nothing to do with the tubing inner diameter, and only rises linearly with the wellhead pressure, when the actual lifting differential pressure is lower than the critical lifting differential pressure, it is necessary to consider the problem of insufficient fluid power of the well; the tubing inner diameter only increases with the wellhead pressure; the critical lifting differential pressure has no effect on the wellhead pressure, so it is necessary to consider the problem of insufficient fluid lifting power of the gas well; when the tubing inner diameter remains unchanged, the critical formation pressure rises linearly with the wellhead pressure, and in the case of a large consumption of formation pressure, the critical formation pressure is easy to exceed the actual formation pressure of the gas well, i.e., the gas well will be triggered to stop blowout due to the insufficient driving energy. The application example proves that the method can effectively identify the reasons for the blowout stoppage of horizontal gas wells and provide theoretical basis for the technological measures. The establishment of this method is of great significance for the high-efficiency development of the low-pressure stage of constant-volume gas reservoirs.

Cite this article

Liu Shubing , Yan Xuecheng , Song Yang , Zhang Hexing , Liu Lei , Chen Hong . Method for Identifying the Cause of Blowout Stoppage of Horizontal Wells in Constant-Volume Gas Reservoirs and Its Application[J]. Special Oil & Gas Reservoirs, 2023 , 30(6) : 150 -156 . DOI: 10.3969/j.issn.1006-6535.2023.06.020

References

[1] 杨川东,李联奎,王季明,等.采气工程[M].北京:石油工业出版社,1997:130-131.
YANG Chuandong,LI Liankui,WANG Jiming,et al.Gas production engineering[M].Beijing:Petroleum Industry Press,1997:130-131.
[2] 陈志明,赵鹏飞,曹耐,等.页岩油藏压裂水平井压-闷-采参数优化研究[J].石油钻探技术,2022,50(2):30-37.
CHEN Zhiming,ZHAO Pengfei,CAO Nai,et al.Fracturing parameters optimization of horizontal wells in shale reservoirsduring well fracturing-soaking-producing[J].Petroleum Drilling Techniques,2022,50(2):30-37.
[3] 邱凯旋,李恒,张丽霞,等.考虑定压生产的陆相页岩气藏多层窜流产能模型[J].非常规油气,2023,10(1):104-110.
QIU Kaixuan,LI Heng,ZHANG Lixia,et al.Continental shale gas reservoir interlayer crossflow production model considering constant pressure condition[J].Unconventional Oil & Gas,2023,10(1):104-110.
[4] 康志江,李彤.凝析气井停喷条件的确定[J].新疆石油地质,1998,15(5):417-420.
KANG Zhijiang,LI Tong.Determination of stop flowing condition of gas condensate well[J].Xinjiang Petroleum Geology,1998,15(5):417-420.
[5] 孙国明,刘永建,林仲,等.徐深1气井停喷压力预测方法[J].大庆石油学院学报,2008,32(4):53-55.
SUN Guoming,LIU Yongjian,LIN Zhong,et al.Prediction method of stoppage pressure in Xusuhen 1 Gas Well[J].Journal of Daqing Petroleum Institute,2008,32(4):53-55.
[6] 张加良,余元洲,王艳华,等.凝析气井停喷产量及停喷压力研究与应用[J].新疆石油地质,2010,31(6):624-625.
ZHANG Jialiang,YU Yuanzhou,WANG Yanhua,et al.Unflowing production and pressure research and application for condensate gas well[J].Xinjiang Petroleum Geology,2010,31(6):624-625.
[7] 王琦,李颖川,王志彬,等.水平气井连续携液实验研究及模型评价[J].西南石油大学学报(自然科学版),2016,36(3):140-144.
WANG Qi,LI Yingchuan,WANG Zhibin,et al.Experimental study and model evaluation on continuous liquid removal in horizontal gas well[J].Journal of Southwest Petroleum University(Science & Technology Edition),2016,36(3):140-144.
[8] 邱凯旋,李恒,郝世彦,等.含砂岩薄互层陆相页岩气藏生产预测模型研究[J].非常规油气,2023,10(1):111-121.
QIU Kaixuan,LI Heng,HAO Shiyan,et al.Study on production model prediction of continental shale gas reservoir with thin interbedded sandstone[J].Unconventional Oil & Gas,2023,10(1):111-121.
[9] 王武杰,崔国民,魏耀奇,等.倾斜气井临界携液流速预测新模型[J].石油勘探与开发,2021,48(5):1053-1060.
WANG Wujie,CUI Guomin,WEI Yaoqi,et al.A new model for predicting the critical liquid-carrying velocity in inclined gas wells[J].Petroleum Exploration and Development,2021,48(5):1053-1060.
[10] 李昌绵,李爽,柳琳,等.苏里格气田苏S区块高含水气藏气水识别及开发对策研究[J].非常规油气,2022,9(3):64-71.
LI Changmian,LI Shuang,LIU Lin,et al.Study on gas-water identification and development strategy of high water-cut gas reservoir in Su S Block of Sulige Gas Field[J].Unconventional Oil & Gas,2022,9(3):64-71.
[11] 刘晓旭,李旭,王磊,等.大斜度高液气比气井连续携液气流速预测方法[J].石油钻采工艺,2022,44(1):68-74.
LIU Xiaoxu,LI Xu,WANG Lei,et al.Prediction method of continuous liquid-carrying gas flow rate for highly deviated and high liquid-gas ratio gas wells[J].Oil Drilling & Production Technology,2022,44(1):68-74.
[12] 李金潮,邓道明,沈伟伟,等.倾斜气井积液临界气相流速预测新模型[J].石油学报,2022,43(5):708-718.
LI Jinchao,DENG Daoming,SHEN Weiwei,et al.A new prediction model of the critical gas velocity for liquid loading in deviated gas wells[J].Acta Petrolei Sinica,2022,43(5):708-718.
[13] 刘永辉,艾先婷,罗程程,等.预测水平井携液临界气流速的新模型[J].深圳大学学报(理工版),2018,35(6):551-557.
LIU Yonghui,AI Xianting,LUO Chengcheng,et al.A new model for predicting critical gas velocity of liquid loading in horizontal well[J].Journal of Shenzhen University(Science & Engineering),2018,35(6):551-557.
[14] 陈元千,张霞林,齐亚东.水平气井二项式方程的推导与应用[J].断块油气田,2014,21(5):601-606.
CHEN Yuanqian,ZHANG Xialin,QI Yadong.Derivation and application of quadratic form equation for horizontal gas wells[J].Fault-Block Oil & Gas Field,2014,21(5):601-606.
[15] 陈海力.涩北气田水平井井筒压力计算研究[D].东营:中国石油大学(华东),2009.
CHEN Haili.Research on Calculation of wellbore pressure of horizontal wells in Shibei Gasfield[D].Dongying:China University of Petroleum(East China),2009.
[16] 尹琅,黄全华,秦华,等.倾斜大管径拟单相流气井井底流压计算[J].重庆科技学院学报(自然科学版),2011,13(5):74-77.
YIN Lang,HUANG Quanhua,QIN Hua,et al.On gas well's bottom hole flowing pressure calculation in inclined big diameter pseudo single-phase flow[J].Journal of Chongqing University of Science and Technology (Natural Sciences Edition),2011,13(5):74-77.
[17] 马新华,熊建嘉,徐春春,等.气藏工程[M].北京:石油工业出版社,2001:103-105.
MA Xinhua,XIONG Jianjia,XU Chunchun,et al.Gas reservoir engineering[M].Beijing:Petroleum Industry Press,2001:103-105.
[18] 万伟,练章华,彭星煜,等.大牛地气田二次增压时机及增压方案优选[J].西南石油大学学报(自然科学版),2019,41(3):129-136.
WAN Wei,LIAN Zhanghua,PENG Xingyu,et al.Comparative selection of optimal timing and strategy for secondary supercharging in Daniudi Gas Field[J].Journal of Southwest Petroleum University(Science & Technology Edition),2019,41(3):129-136.
[19] 刘书炳,王定峰,刘磊,等.大位移水平井连续油管排水采气工艺研究[J].天然气与石油,2022,40(6):61-68.
LIU Shubing,WANG Dingfeng,LIU Lei,et al.Research on VS deliquification and gas production technology in extended reach horizontal wells[J].Natural Gas and Oil,2022,40(6):61-68.
Outlines

/