Special Oil & Gas Reservoirs ›› 2026, Vol. 33 ›› Issue (5): 145-151.DOI: 10.3969/j.issn.1006-6535.2026.05.018

• Drilling & Production Engineering • Previous Articles     Next Articles

Technology for assuring cement-sheath sealing integrity during multistage fracturing in shale gas wells

Liu Jian1,2, Song Weitao1,2, Li Zaoyuan1,2, Wu Xuning1,2, Li Jin3, Liu Yang3, Liu Mingrui1,2, Zhang Jiukang1,2   

  1. 1. State Key Laboratory of Oil & Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu, Sichuan 610500, China;
    2. Petroleum Engineering School, Southwest Petroleum University, Chengdu, Sichuan 610500, China;
    3. Downhole Operation Company, CNPC Chuanqing Drilling Engineering Co., Ltd., Chengdu, Sichuan 610052, China
  • Received:2025-12-30 Revised:2026-05-09 Online:2026-10-25 Published:2026-11-24

Abstract: To address mudcake retention at the interface and annular pressure buildup caused by multistage fracturing during shale gas development in the WY Block in Southwest China,and with a view to reducing cost and improving efficiency,a laboratory evaluation method for cement-sheath interfacial sealing performance before fracturing was established.The effects of flushing time,flushing rotation speed,preflush-fluid column design,and cement-slurry contamination on cement-sheath sealing performance were investigated,and the cement-slurry formulation system was optimized.The results show that the hydraulic sealing capacity of the cement-sheath interface is positively correlated with flushing time and flushing rotation speed.The mixing of spacer fluid and drilling mud into the cement slurry affects the sealing performance of the composite.Surfactants can emulsify and dissolve oil-based mud filter cake in advance and markedly improve the hydraulic sealing capacity of the second bonding interface of the cement sheath.Under multistage fracturing,cement-sheath sealing failure is dominated by tensile cracking failure and microannulus failure.The cement-slurry formulation can be optimized by adding admixtures such as expansive agents and fibers,thereby mitigating the damage caused by microannuli and tensile cracks to the zonal-isolation performance of the cement sheath.A complete set of technologies for assuring the sealing integrity of cement sheaths in shale gas well cementing was proposed,and all materials used are commonly available field materials.The technology has been applied in field cementing operations for 14 wells in the WY Block.The cementing qualification rate of the treated wells increased by 18.21 percentage points compared with conventional wells in the same block.After fracturing,no annular pressure buildup occurred in either the B or C annulus of the treated wells,indicating good field performance.This study provides guidance for optimizing flushing parameters and cement-slurry formulations during shale gas well cementing.

Key words: shale gas, well cementing, cement sheath, interfacial sealing integrity, multistage fracturing

CLC Number: