[1] PERMADI P,WIBOWO W,ALAMSYAH Y,et al.Horizontal well completion with stinger for reducing water coning problems[C].SPE37464,1991:567-571. [2] LANDMAN M J,GOLDTHORPE W H.Optimization of perforation distribution for horizontal wells[C].SPE23005,1991:1-6. [3] YUAN H J,SARICA C,BRILL J P.Effect of perforation density on single-phase liquid flow behavior in horizontal well[J].SPE production & facilities,1999,14(3):203-209. [4] BREKKE K,LIEN S C.New and simple completion methods for horizontal wells improve production performance in high-permeability,thin oil zones[J].SPE Drilling & Completion,1994,9(3):205-209. [5] JANSE J D.A semianalytical model for calculating pressure drop along horizontal wells with stringer completions[J].Journal of Canadian Petroleum Technology,2003,8(2):151-160. [6] 韩培慧,曹瑞波.平面非均质油藏合理布井方式实验研究[J].中国科学:技术科学,2011,41(9):1249-1255. HAN Peihui,CAO Ruibo.Experimental study on the reasonable well arrangement in plane heterogeneous reservoir[J].Scientia Sinica Techndogica,2011,41(9):1249-1255. [7] 刘欣颖,胡平.非均质底水油藏水平井三维物理模拟实验[J].石油学报,2011,32(6):1012-1016. LIU Xinying,HU Ping.A 3-D visible physical experiment on horizontal wells of heterogeneous reservoirs with bottom water[J].Acta Petrolei Sinica,2011,32(6):1012-1016. [8] 张舒琴,李海涛.中心管完井流入和压力剖面预测[J].钻采工艺,2009,32(6):43-45. ZHANG Shuqin,LI Haitao.Influx and pressure performance prediction of stinger completion in horizontal well[J].Drilling & Production Technology,2009,32(6):43-45. [9] 包陈义,张斌,李君宝.水平井含泥岩段旁通充填防砂工具研发与应用[J].中国海上油气,2018,30(2):132-137. BAO Chenyi,ZHANG Bin,LI Junbao.Research and application of by-pass packing sand control tool used in horizontal well with mudstone section[J].China Offshore Oil and Gas,2018,30(2):132-137. |